Renovation Team Update - 6/7/2026

Capital Improvement Projects

Two phases of building improvements are planned as part of Building for Tomorrow.

  • Phase 1 will replace the original 1962 natural gas heating system with a highly efficient geothermal water-source heat pump system, providing both heating and cooling.

  • Phase 2 will focus on architectural and accessibility improvements, including energy-efficient doors, windows, and insulation; updated first-floor restrooms; improved access to the Sanctuary chancel with a new ramp and handrails; enhanced Sanctuary audio/visual system to improve closed captioning; and parking lot drainage and repaving.

HVAC Project - Major Milestones

  • Initial design proposal developed to include geothermal - COMPLETE

  • Board approved moving forward proposed plan - COMPLETE

  • RFQ sent to prospective Construction Managers - COMPLETE

  • Interviews conducted with prospective Construction Managers - COMPLETE

  • Board approved selected Construction Manager - COMPLETE

  • Contract with Construction Manager executed - IN-PROGRESS

  • Project plan formalized - SUMMER 2026

  • Design and construction documents to be finalized - Fall 2026

  • Geothermal wells to be drilled - Fall 2026 (possibly)

  • Bulk of construction work to be conducted - Summer 2027

  • New system to be fully operational - September 2027