Handicapped Restroom
continue Building History tour
| In 1990-91 larger signs with braille lettering were installed throughout the building. | ![]() |
| The restroom near the office (north side, first floor of the addition) was reconstructed to be handicapped-accessible in 1991-92. The block wall was moved outward to increase the enclosed space, a larger door fitted, and accessible fixtures installed. | ![]() |
continue Building History tour
May 1 2008




