Installation of Removeable Handrails
continue Building History tour
| In 1997, as part of general refinishing and restoration of the Auditorium stage, handrails were constructed and installed in order to make ascending the stage steps less of a test of balance. | ![]() |
| Four rails were fabricated which can be installed in any (or none) of six positions around the stage perimeter, permitting a flexible tradeoff between accessibility and openness as needed. | ![]() |
continue Building History tour
May 1 2008